Skip to content

Drilling under Sava River near city of Krško

Implementation of HDPE pipe with Horizontal directional drilling (HDD) –  trenchless technology under  Sava River near city of Krško. Lenght L = 240 m, Diameter of final reaming pass – 420 mm, Type of Pipe: PEHD DN 280. Ground conditions: send, gravel, cobbles,clay stone 50%.