Implementation of HDPE pipe with Horizontal directional drilling (HDD) – trenchless technology where we drilled under the hill in the average gradientof 60%. Lenght L = 105 m, Diameter of final reaming pass – 270 mm, Type of Pipe: PEHD DN 160. Ground conditions: send, clay, metamorphic rock 50%