Skip to content

Crossing River Krka with Horizontal directional drilling (HDD)

The existing water line, which was mounted on the wooden bridge, was relocated under the river of Krka. To do that, we have done a horizontal directional drilling bore, which was paralel to the bridge. We have installed a new PEHD water line with dimension of 160mm.